Project Overview
Brookefields is a prominent commercial development where baseplate anchoring works were executed in 2020. The scope involved anchoring for a connecting bridge designed by CRN Architects, using Hilti anchoring systems. The works ensured structural integrity, precise load transfer, and compliance with approved design and safety standards.
Work Process
-
Drawing Review & Coordination
Reviewed approved drawings from CRN Architects and coordinated with the client to finalize anchoring scope and technical requirements.
-
Site Survey & Setting Out
Accurate marking of anchor locations for the connecting bridge as per design specifications.
-
Drilling & Surface Preparation
Precision drilling carried out using suitable equipment, followed by proper hole cleaning to meet Hilti installation guidelines.
-
Baseplate Anchor Installation
Installation of Hilti anchor bolts ensuring correct alignment, embedment depth, and torque values.
-
Inspection & Quality Check
Verification of anchoring works for load compliance, safety, and adherence to approved standards.
-
Completion & Handover
Final inspection and handover of completed baseplate anchoring works.
Work Highlights